X-WEDGE WALKER WR1000 Endurance Ride: 1,051.9 KM in 17 Hours 32 Minutes

For any motorcycle, a long-distance journey is about much more than simply covering kilometres. It is a test of machine endurance, fuel management, riding consistency and the rider’s discipline throughout the journey.

That was the objective behind the X-WEDGE WALKER WR1000 Endurance Ride, a long-distance journey that covered a total of 1,051.9 kilometres over 17 hours and 32 minutes.

The journey started and ended in Semenyih, Selangor, taking the WR1000 through the KL-Karak Expressway, LPT 1 and LPT 2 before reaching several key destinations in Terengganu, including Kuala Terengganu and Kuala Kerteh.

Throughout the ride, every major stop was recorded, including the time, odometer reading, trip meter, location and fuel status. The records provide a detailed picture of how the WR1000 performed from the beginning of the ride until the final kilometre.

The Journey Begins in Semenyih

The X-WEDGE WALKER WR1000 Endurance Ride began at 8:18 am in Semenyih, Selangor.

At the start of the journey, the odometer displayed 1,299.1 km, while the trip meter was reset to 0.0 km.

The motorcycle started the ride with 23 litres of fuel.

From Semenyih, the WR1000 headed towards Bentong via the KL-Karak Expressway.

After covering 97.0 km, the motorcycle arrived at Petronas Bentong at 9:42 am.

Pit Stop 1 — Petronas Bentong

  • Time: 9:42 am
  • Elapsed duration: 1 hour 24 minutes
  • Odometer: 1,396.1 km
  • Trip meter: 97.0 km
  • Fuel status: 23L

The first stop was used as a short rest before continuing towards Temerloh.

Through LPT 1

The next leg took the WR1000 towards Temerloh R&R on LPT 1.

The motorcycle arrived at 10:32 am, with the trip meter showing 169.6 km.

Pit Stop 2 — Temerloh R&R

  • Time: 10:32 am
  • Elapsed duration: 2 hours 14 minutes
  • Odometer: 1,468.7 km
  • Trip meter: 169.6 km
  • Fuel status: 23L

After the rest stop, the journey continued towards Gambang.

At this stage, the WR1000 was still running on its original fuel load before making its first refuelling stop at Gambang R&R.

Pit Stop 3 — Gambang R&R: First Fuel Stop

At 11:35 am, the WR1000 arrived at Gambang R&R with the trip meter showing 235.6 km.

This stop served two purposes: a short rest and the first fuel refill of the journey.

A total of 10 litres of fuel was added.

The recorded fuel total became: 23L + 10L = 33L

Pit Stop 3 Record

  • Time: 11:35 am
  • Elapsed duration: 3 hours 17 minutes
  • Odometer: 1,534.7 km
  • Trip meter: 235.6 km
  • Fuel added: +10L

After the fuel stop, the WR1000 continued onto LPT 2 towards Terengganu.

From Gambang to Kijal

The journey continued east towards the Terengganu stretch of LPT 2 before the WR1000 stopped at Kijal Lay-by.

The motorcycle arrived at 12:49 pm, after covering 340.8 km.

Pit Stop 4 — Kijal Lay-by

  • Time: 12:49 pm
  • Elapsed duration: 4 hours 31 minutes
  • Odometer: 1,639.9 km
  • Trip meter: 340.8 km
  • Fuel status: 33L

After the rest break, the WR1000 continued towards Paka R&R.

Pit Stop 5 — Paka R&R: Second Fuel Stop

At 1:31 pm, the motorcycle arrived at Paka R&R with the trip meter showing 382.7 km.

Another 15 litres of fuel were added.

The cumulative recorded fuel total became: 23L + 10L + 15L = 48L

Pit Stop 5 Record

  • Time: 1:31 pm
  • Elapsed duration: 5 hours 13 minutes
  • Odometer: 1,681.8 km
  • Trip meter: 382.7 km
  • Fuel added: +15L

With the fuel level replenished, the WR1000 continued towards Kuala Terengganu.

Checkpoint 1 — Kuala Terengganu Drawbridge

One of the key moments of the endurance ride came at the Kuala Terengganu Drawbridge, which served as Checkpoint 1 for the journey.

The WR1000 arrived at the location at 3:26 pm.

At that point, the trip meter had reached 506.6 km, while the odometer displayed 1,805.7 km.

The stop was not only used for a rest break. It also served as a photography and documentation point for the endurance ride.

Checkpoint 1 Record

  • Location: Kuala Terengganu Drawbridge
  • Time: 3:26 pm
  • Elapsed duration: 7 hours 8 minutes
  • Odometer: 1,805.7 km
  • Trip meter: 506.6 km
  • Fuel status: 48L

After the photography session, the WR1000 continued its journey before stopping at a BHP station in Kuala Terengganu for its next fuel refill.

Third Fuel Stop — Kuala Terengganu

At 4:00 pm, another 11 litres of fuel were added.

The cumulative recorded fuel total became: 23L + 10L + 15L + 11L = 59L

The trip meter had reached 519.3 km.

With another fuel refill completed, the journey continued south along the Terengganu route.

Continuing Towards Kuala Kerteh

At 4:33 pm, the WR1000 stopped at Ajil R&R.

Pit Stop 7 — Ajil R&R

  • Time: 4:33 pm
  • Elapsed duration: 8 hours 15 minutes
  • Odometer: 1,851.1 km
  • Trip meter: 552.0 km

After the break, the motorcycle continued towards Kuala Kerteh.

The WR1000 arrived in Kuala Kerteh at 7:15 pm, marking the point where the endurance ride moved into its night-riding phase.

Pit Stop 8 — Kuala Kerteh

  • Time: 7:15 pm
  • Elapsed duration: 10 hours 57 minutes
  • Odometer: 1,955.0 km
  • Trip meter: 656.8 km

As daylight faded, the ride entered another demanding stage. After Kuala Kerteh, the WR1000 continued before stopping at Kijal R&R at 8:44 pm.

Pit Stop 9 — Kijal R&R

By the time the motorcycle reached Kijal R&R, the trip meter had reached 712.7 km.

Pit Stop 9 Record

  • Time: 8:44 pm
  • Elapsed duration: 12 hours 26 minutes
  • Odometer: 2,011.8 km
  • Trip meter: 712.7 km
  • Fuel status: 59L

After the rest break, the WR1000 continued towards Perasing R&R.

Fourth Fuel Stop — Perasing R&R

At 9:19 pm, the WR1000 arrived at Perasing R&R after covering 751.3 km.

This became the fourth recorded fuel stop of the journey.

A total of 19.8 litres was recorded as the fuel refill, with the original journey log identifying the figure as a float value.

The cumulative fuel record at this point was: 23L + 10L + 15L + 11L + 19.8L

Fourth Fuel Stop Record

  • Time: 9:19 pm
  • Elapsed duration: 13 hours 1 minute
  • Odometer: 2,050.4 km
  • Trip meter: 751.3 km
  • Fuel added: 19.8L

After Perasing R&R, the WR1000 began the return leg towards Selangor.

The Return Journey Begins

After more than 13 hours on the road, the endurance ride entered its return phase.

The WR1000 retraced its route along LPT 2 before joining LPT 1 again.

At 10:37 pm, the motorcycle arrived at Gambang R&R.

Pit Stop 10 — Gambang R&R

  • Time: 10:37 pm
  • Elapsed duration: 14 hours 19 minutes
  • Odometer: 2,118.9 km
  • Trip meter: 819.8 km

The journey continued towards Temerloh.

Pit Stop 11 — Temerloh R&R

At 11:31 pm, the WR1000 arrived at Temerloh R&R with the trip meter showing 885.4 km.

Pit Stop 11 Record

  • Time: 11:31 pm
  • Elapsed duration: 15 hours 13 minutes
  • Odometer: 2,184.5 km
  • Trip meter: 885.4 km

From Temerloh, only a few more stops remained before the ride reached its final destination.

Pit Stop 12 — Lanchang Lay-by

At 12:08 am, the WR1000 stopped at Lanchang Lay-by on LPT 1.

Pit Stop 12 Record

  • Time: 12:08 am
  • Elapsed duration: 15 hours 50 minutes
  • Odometer: 2,225.0 km
  • Trip meter: 925.9 km

At this point, approximately 126 km remained to complete the 1,000-kilometre target.

The Finish — Semenyih, Selangor

After more than 17 hours on the road, the X-WEDGE WALKER WR1000 finally returned to Semenyih, Selangor, at 1:50 am.

The trip meter stopped at: 1,051.9 KM

The odometer displayed: 2,351.0 km

The complete journey took 17 hours and 32 minutes, from the 8:18 am departure until the motorcycle returned to Semenyih at 1:50 am.

The total recorded fuel consumption for the journey was 79.5 litres, resulting in an average fuel efficiency of approximately 13 km/L, based on the recorded journey data.

X-WEDGE WALKER WR1000 — Final Ride Statistics

ParameterRecord
Starting pointSemenyih, Selangor
Finishing pointSemenyih, Selangor
Start time8:18 am
Finish time1:50 am
Total duration17 hours 32 minutes
Total distance1,051.9 km
Total pit stops12
Total recorded fuel79.5L
Fuel efficiencyApproximately 13 km/L
Fuel tank capacity23L
Maximum distance per tankApproximately 300 km
Reference cruising speed130–140 km/h
Main checkpointKuala Terengganu Drawbridge

1,051.9 KM — More Than Just a Number

The X-WEDGE WALKER WR1000 Endurance Ride was more than simply an attempt to cross the 1,000-kilometre mark.

The journey went through several distinct stages — beginning in Semenyih in the morning, crossing the KL-Karak Expressway, LPT 1 and LPT 2, continuing into Terengganu, reaching Kuala Terengganu and Kuala Kerteh, and eventually returning to Selangor in the early hours of the following morning.

Every pit stop served a purpose. Some were used for rest, others for fuel refills, while the Kuala Terengganu Drawbridge became the main checkpoint and documentation location.

Fuel management was another important part of the endurance ride. With a 23-litre fuel tank, the journey records indicate a maximum range of approximately 300 km per tank at a reference speed of around 130–140 km/h.

By the end of the journey, the WR1000 had not only surpassed the 1,000-kilometre target but completed a total distance of 1,051.9 km.

More importantly, the entire journey was documented systematically — from the first kilometre in Semenyih to the final return after 17 hours and 32 minutes on the road.

1,051.9 kilometres. 17 hours 32 minutes. 79.5 litres of fuel.

SpecificationX-WEDGE WALKER WR1000
Engine TypeV2-cylinder, 4-stroke, liquid-cooled, OHC, EFI
Displacement976 cc
Bore × Stroke91 × 75 mm
Compression Ratio11.75:1
Maximum Power60 kW @ 7,500 rpm
Maximum Torque80 Nm @ 5,500 rpm
TransmissionCVT Shaft
Clutch TypeAutomatic clutch
Final DriveShaft drive